Fill the measuring chamber with the desired amount of chemical. Open
a Chemical Valve, allowing the unit to draw chemical into the measuring
chamber. As the liquid level approaches the desired level, start to partially
close the Chemical Valve, slowing down the filling rate. Completely
close the Chemical Valve when the liquid level reaches the desired
level.